Skip to content
  • Home
  • Business
  • Work
  • Live
  • About
Menu
  • Home
  • Business
  • Work
  • Live
  • About
Holyoke has Energy
  • Job Postings
  • Career Training
Menu
  • Job Postings
  • Career Training

Urban Renewal Plan Documents

  1. Home
  2. About Holyoke
  3. Plans and Studies
  4. The Urban Renewal Plan
  5. Urban Renewal Plan Documents
    2020 URP Documents
    Frequently Asked Questions
    Chapters
    • Cover and Table of Contents
    • Introduction Letter from HRA
    • Executive_Summary
    • Section 1 – Characteristics
    • Section 2 – Area Eligibility
    • Section 3 – Project Objectives
    • Section 4 – Cost Estimates and Financing Plan
    • Section 5 – Local Approvals
    • Section 6 – Site Preparation
    • Section 7 – Public Improvements
    • Section 8 – Relocation
    • Section 9 – Redevelopers Obligation
    • Section 10 – Property Disposition
    • Section 11 – Citizen Participation
    • Section 12 – Implementation
    Attachments
    • A. CPC Documentation
    • B. HRA Member Area Surveys
    • C. Real Estate Tax Revenue and Investment Estimates
    • D. Approval Documents
    • E. Marketing Materials, Outreach Documents and Press
    Acquisition Property Descriptions by Area
    • Area 1 – Dwight Street Gateway
    • Area 2 – Veteran’s Park Area
    • Area 3 – Cabot and Chestnut Area
    • Area 4 – High Street Area
    • Area 5 – Passenger Rail/Transit Oriented Development Area (TOD)
    • Area_6 – High Performance Computer Center
    • Area 7 – Parsons Paper Redevelopment
    • Area 8 – South Holyoke
    • Area 9 – Cabot Street Gateway
    • Area 10 – Riverfront Area along Second and Third Canal
     Additional Documents
    • Two-page plan summary
    • Info Session Flyer
    • Public Hearing Flyer (ingles y espanol)
    • Sesión Pública de Información página
    • Resúmen Ejecutivo del Plan
    • Resúmen informativo de una página
    • C.O.D.E. Services Program Application
    Maps
    • A-1 Urban Renewal Plan Area Location
    • A-2 Urban Renewal Plan Area Context
    • A-3 Project Boundary and Topography
    • A-4 FEMA Floodplan Delineation Map
    • B-1 Boundary of Proposed Clearance and Rehabilitation Areas
    • C-1 Existing Property Lines, Building Footprints and Parking Areas
    • C-2 Proposed Property Lines, Building Footprints and Parking Area
    • D-1 Existing Land Use As Per City of Holyoke Land Use Codes
    • D-2 Existing Zoning
    • D-3 Existing Special Overlay Districts
    • E-1 Proposed Land Use
    • F-1 Existing Thoroughfares, Public Right-of-Ways and Easements
    • G-1 Parcels to be Acquired
    • H-1 Lots to be Created for Disposition
    • I-1 Buildings to be Demolished
    • J-1 Buildings to be Rehabilitated
    • K-1 Lots for Buildings to be Constructed
    • L-2 Holyoke Center City Vision Plan Map
    Holyoke Has Energy

    Holyoke Office of Planning & Economic Development

    20 Korean Veterans Plaza, Suite 406
    Holyoke, MA 01040

    Sitemap | Accessibility Statement

    Sign up for Newsletter

    © 2022 Holyoke Redevelopment Office. All rights reserved. Site by MRW.